WEST VIRGINIA CODE
WVC 17 - 17 - 30
§17-17-30. Construction, operation, etc., of toll bridges and
tunnels by counties and cities -- Authorized;
authority to borrow money; consent of federal
government and state road commission.
Any incorporated city, in which or adjoining which there is
a portion of a navigable or nonnavigable river or stream, either
wholly within the state of West Virginia, or partly within the
said state, and another state or states, or between the state of
West Virginia and any other state, including the Ohio River in
this state, from its intersection with the Pennsylvania state
line, to the mouth of the Big Sandy River, is hereby authorized
and empowered, in its corporate capacity, or through and by means
of a bridge commission or other agency to be created or appointed
by it, to construct, reconstruct, maintain and operate a highway
toll bridge or tunnel, or combination thereof, over or under and
across, such river or stream, from such a point within the
corporate limits of such city, to such point on the opposite side
of such river or stream, either within or without said city, as
the said city, through its proper authorities, shall designate
and select, for public use in travel, passage and transportation,
over or under and across such river or stream, and any such city
may also construct, reconstruct, maintain and operate a highway
toll tunnel under or through any mountain, hill or embankment,
together with any bridges, causeways, fills or other approaches
thereto, from a point within the corporate limits of such city to
any other point either within or without the corporate limits of
such city:
Provided, however, That no bridge or tunnel shall be constructed, reconstructed, established or operated, over or
under and across any navigable river, or under any mountain, hill
or other embankment, without compliance with the requirements,
conditions and provisions provided by the Congress of the United
States and the laws of the United States, nor without approval of
the state road commission of this state; and such city is
authorized and empowered to borrow money by means of bonds
payable from revenues, or otherwise, and/or to accept grants in
part payment therefor from any state or federal governmental
agency authorized to make loans, a sum of money sufficient and
necessary to pay all costs of construction or reconstruction of
such bridge or tunnel, or combination thereof, including
approaches thereto, the acquisition of all necessary rights-of-
way and all engineering, legal and other expenses necessary
thereto or connected therewith, including interest during
construction, or reconstruction, as a self-liquidating enterprise
or project, within the meaning of the state or federal laws
authorizing loans by any such governmental agency. And the
county court of any county, in which there is a portion of such
river or stream, or on which its county abuts or borders, is
likewise authorized and empowered to construct, reconstruct,
maintain and operate a highway toll bridge or bridges, or tunnel
or tunnels, over or under and across such river or stream, and to
construct, reconstruct, maintain and operate a highway toll
tunnel under any mountain, hill or other embankment, and to
borrow money, as aforesaid, for the construction or
reconstruction thereof, in like manner and to the same extent, as such city, and to construct, reconstruct, maintain and operate
such bridge or tunnel subject to the same limitations as are
hereby imposed in the case of such cities.
Wherever the words "bridge,""toll bridge" or "highway toll
bridge" are used in sections thirty-one, thirty-two, thirty-three
or thirty-four of this article, or any of the other provisions of
this article, the same shall be deemed to include bridges or
tunnels, or any combinations thereof, together with any
causeways, fills, or approaches necessary therefore.
Note: WV Code updated with legislation passed through the 2012 1st Special Session